Navigation
We provide stamped, code-compliant engineering for soldier piles, soil nails, underpinning, and concrete formwork support.
1,000+ Deferred Submittals Engineered Successfully.
We engineer code-compliant earth retention systems, such as soldier piles and soil nail walls, optimized to reduce steel tonnage and drilling costs.
We provide precise calculations for supporting curing slabs and formwork during multi-story construction. This includes load analysis for falsework and heavy equipment placement to prevent structural failure during the build.
We treat shop drawings as critical items. Our workflow is optimized to turn around designs in days (not weeks) so you never wait on a stamp to start fabrication.
We hold PE/SE licenses across the entire US. Whether you are building locally or shipping units nationally, one team covers your projects.
We assume the design liability for the components we engineer. Our comprehensive reviews ensure full code compliance and quick permit approval.
Zenith saved our timeline. We needed urgent steel connection design services for a project in LA. They turned around the calc package in record time, allowing fabrication to start immediately.
Navigating deferred submittals engineering with the city was a nightmare until Zenith took over. Their engineering calculations for permit were approved on the first round.
Reach out today to talk to one of our specialty structural engineering experts.